Our Firm
Properties
Projects
   
 


We currently have one community under construction:


Hollymead, Flower Mound, TX

Hollymead is a 112-bed, 64,852 square-foot continuing care center located north of Dallas in the burgeoning town of Flower Mound, TX.  The 5.646-acre site is located within approximately 4 miles of 3 hospitals having 334-beds, including 190-bed Medical Center of Lewisville, 103-bed Texas Health Presbyterian Hospital Flower Mound and 41-bed Continuum Rehabilitation Hospital of North Texas.  Hollymead features 96 private occupancy resident rooms and 8 semi-private occupancy rooms, all with private baths.  It also includes a formal living area with a fireplace, a library, a chapel, an amenities shop, a beauty salon, two neighborhood cafes, two courtyards and a large multi-disciplinary rehabilitation center.  Construction of Hollymead began in June, 2013 and was completed in August, 2014.


Hollymead


Hollymead - Exterior


Hollymead - Patio Suite


Hollymead - Cross Timbers Living Room


Sorrento, San Antonio, TX

Sorrento will be a 112-bed, 64,454 square-foot continuing care center located within the area known as South Texas Medical Center in northwestern San Antonio.  The 5.218-acre site will be located on the Christus Santa Rosa Medical Center Campus. It is located less than 1 mile from 5 hospitals having 1,909-beds, including 178-bed Christus Santa Rosa Medical Center, 268-bed Audie L. Murphy Memorial VA Hospital, 672-bed Methodist Hospital, 295-bed Saint Luke’s Baptist Hospital and 496-bed University Hospital.  Sorrento will feature 96 private occupancy resident rooms and 8 semi-private occupancy rooms, all with private baths.  It will also include a formal living area with a fireplace, a library, a chapel, an amenities shop, a beauty salon, two neighborhood cafes, three courtyards and a large multi-disciplinary rehabilitation center.  Construction of Sorrento began in October, 2013 and is expected to be completed in October, 2014. 


Sorrento Construction Site 10-09-14 (current month)


Sorrento Construction Site 09-18-14 (prior month)

 
   
Top